Fully remodeled bathroom with tiled shower and new vanity installed by BathPeak in a compact post-war home off South Main Street in High Point, Guilford County NC

High Point, NC · Guilford County

Full Bathroom Remodeling in High Point, NC

A full remodel that makes a compact High Point bathroom work harder, with storage and layout planned before any demolition.

Typical investment
$18,991 – $39,991
Timeline
Project-specific timeline
Warranty
1-year workmanship

Full Bathroom Remodel for High Point homes

Many High Point homes, especially older housing near Emerywood's edges and the post-war blocks off South Main, have small hall bathrooms — often around 5 by 7 feet.

In a room that size, a full remodel is about every inch: recessed niches instead of shelves, a pocket door where a swinging door blocks the vanity, a wall-hung vanity to open up floor space, and better lighting.

We go over the layout and materials with you and provide one written package price with the full scope of work.

See everything we do in High Point, or compare the full full bathroom remodel guide for our whole Piedmont Triad, NC service area.

Free High Point full bathroom remodel quote

Or call (336) 300-2524 and speak with our team now.

BathPeak serves High Point as part of its Piedmont Triad, North Carolina service area.

  1. Step 1: Project
  2. Step 2: Location
  3. Step 3: Timing
  4. Step 4: Investment
  5. Step 5: Contact

Step 1 of 5 · Project

What are you interested in?

Fully insured in NCRemodeling roots since 202230+ years combined install experience
Prefer to talk? Call (336) 300-2524
  • Fully insured in North Carolina
  • Permit requirements explained up front
  • Written package pricing · changes approved in writing
  • Project-specific timeline

Why High Point homeowners choose BathPeak

  • Free in-home consultation
  • Written project scope
  • Written package pricing
  • Changes approved in writing
  • Project-specific timeline
  • Daily cleanup and communication
  • 1-year workmanship warranty
  • Insured
  • Experienced installation team
  • Serving High Point
See how a BathPeak project works →

What a full bathroom remodel in High Point includes

Glass, paint and punch list

Frameless or semi-frameless enclosure measured after tile, walls and trim painted, and a written punch list closed out before final payment.

Full demolition

Tile, tub, vanity, toilet, flooring and drywall removed to framing, with dust containment at the door and daily debris haul-off.

Subfloor and framing repair

Water-damaged subfloor sistered or replaced, floors leveled, and blocking added for grab bars, benches and heavy vanities while the wall is open.

Plumbing rough-in

New PEX or copper supply lines, correctly sized and vented drains, and a modern pressure-balancing or thermostatic shower valve.

Electrical and ventilation

GFCI protection, dedicated vanity and light circuits where code requires, and an exhaust fan ducted to the exterior rather than the attic.

Waterproofing

A full bonded waterproof system on the shower walls and pan — not just cement board and hope — plus a flood test before any tile is set.

Full Bathroom Remodel pricing in High Point

$18,991 – $39,991

Within BathPeak's general $18,991–$39,991 remodel range, hall and guest baths tend to land in the low-to-mid range, while primary suites with frameless glass, a double vanity and a separate shower and tub run toward the top.

Financing is available through Momnt Financing. Ask our team about current options during your consultation.

What moves the price

  • Tile selection — porcelain field tile versus stone or large-format
  • Frameless glass versus a semi-frameless or curtain opening
  • Double vanity, custom cabinetry or stone tops
  • Heated floors, niches, benches and linear drains
  • Bathroom size and whether the footprint changes

How your High Point project runs

We aim to have key materials on hand before a High Point remodel starts, so work can move steadily once demo begins.

  1. Step 1

    In-home consultation

    One visit covering design, materials and pricing. You get a written package quote with the full scope of work before we leave.

  2. Step 2

    Order and schedule

    Your deposit releases the material order, and we lock your install date — typically 10 to 21 days out.

  3. Step 3

    Demo and rough-in

    Tear-out, framing repair, plumbing and electrical rough-in.

  4. Step 4

    Waterproof and tile

    Bonded waterproofing, flood test, then floor and wall tile set and grouted.

  5. Step 5

    Finish and glass

    Vanity, tops, fixtures, paint, trim and the enclosure measured and installed.

  6. Step 6

    Walkthrough

    We walk the finished bathroom with you on the completion day, close the punch list and hand over the written warranty.

More detail on our full process and what the warranty covers.

Remodeling small High Point bathrooms

Pocket doors

A pocket door can free up space, but it depends on what's inside the wall. We check before suggesting it.

Recessed storage

Niches and recessed cabinets use wall depth instead of floor space where framing allows.

Light and ventilation

Small baths benefit from better lighting and a properly sized exhaust fan.

Full Bathroom Remodel questions from High Point homeowners

More answers on our FAQ page.

Other bathroom services in High Point

Ready for your High Point full bathroom remodel?

Use the form above or request your free High Point quote on our contact page.

Call Now