Fully remodeled bathroom with tiled shower and new vanity installed by BathPeak in a compact frame mill house near downtown Randleman, Randolph County NC

Randleman, NC · Randolph County

Full Bathroom Remodeling in Randleman, NC

Rebuild an older Randleman bathroom properly, including floor framing damaged by years of tub leaks.

Typical investment
$18,991 – $39,991
Timeline
Project-specific timeline
Warranty
1-year workmanship

Full Bathroom Remodel for Randleman homes

Decades of moisture near the tub can leave older Randleman bathroom floors soft or damaged.

A full remodel is the time to repair the subfloor and framing before new tile, fixtures and finishes go in.

BathPeak's general full-remodel range is $18,991–$39,991. You get one written package price with the full scope of work. Damage found after demolition is explained and approved in writing.

See everything we do in Randleman, or compare the full full bathroom remodel guide for our whole Piedmont Triad, NC service area.

Free Randleman full bathroom remodel quote

Or call (336) 300-2524 and speak with our team now.

BathPeak serves Randleman as part of its Piedmont Triad, North Carolina service area.

  1. Step 1: Project
  2. Step 2: Location
  3. Step 3: Timing
  4. Step 4: Investment
  5. Step 5: Contact

Step 1 of 5 · Project

What are you interested in?

Fully insured in NCRemodeling roots since 202230+ years combined install experience
Prefer to talk? Call (336) 300-2524
  • Fully insured in North Carolina
  • Permit requirements explained up front
  • Written package pricing · changes approved in writing
  • Project-specific timeline

Why Randleman homeowners choose BathPeak

  • Free in-home consultation
  • Written project scope
  • Written package pricing
  • Changes approved in writing
  • Project-specific timeline
  • Daily cleanup and communication
  • 1-year workmanship warranty
  • Insured
  • Experienced installation team
  • Serving Randleman
See how a BathPeak project works →

What a full bathroom remodel in Randleman includes

Vanity, tops and fixtures

Cabinetry set level and anchored, quartz or cultured tops templated to fit, plus faucets, trim, mirrors and lighting installed and adjusted.

Glass, paint and punch list

Frameless or semi-frameless enclosure measured after tile, walls and trim painted, and a written punch list closed out before final payment.

Full demolition

Tile, tub, vanity, toilet, flooring and drywall removed to framing, with dust containment at the door and daily debris haul-off.

Subfloor and framing repair

Water-damaged subfloor sistered or replaced, floors leveled, and blocking added for grab bars, benches and heavy vanities while the wall is open.

Plumbing rough-in

New PEX or copper supply lines, correctly sized and vented drains, and a modern pressure-balancing or thermostatic shower valve.

Electrical and ventilation

GFCI protection, dedicated vanity and light circuits where code requires, and an exhaust fan ducted to the exterior rather than the attic.

Full Bathroom Remodel pricing in Randleman

$18,991 – $39,991

We hand Randolph County homeowners the full package price and scope of work at the consultation, so you know exactly what's included before you commit.

Financing is available through Momnt Financing. Ask our team about current options during your consultation.

What moves the price

  • Bathroom size and whether the footprint changes
  • Moving the toilet, shower or vanity drain
  • Subfloor, joist or supply-line repair found at demo
  • Tile selection — porcelain field tile versus stone or large-format
  • Frameless glass versus a semi-frameless or curtain opening

How your Randleman project runs

Project duration depends on the scope, demolition, plumbing or electrical changes, materials, inspections, and site conditions. BathPeak provides a project-specific timeline before work begins. Scheduling from signed quote is typically 10 to 21 days.

  1. Step 1

    In-home consultation

    One visit covering design, materials and pricing. You get a written package quote with the full scope of work before we leave.

  2. Step 2

    Order and schedule

    Your deposit releases the material order, and we lock your install date — typically 10 to 21 days out.

  3. Step 3

    Demo and rough-in

    Tear-out, framing repair, plumbing and electrical rough-in.

  4. Step 4

    Waterproof and tile

    Bonded waterproofing, flood test, then floor and wall tile set and grouted.

  5. Step 5

    Finish and glass

    Vanity, tops, fixtures, paint, trim and the enclosure measured and installed.

  6. Step 6

    Walkthrough

    We walk the finished bathroom with you on the completion day, close the punch list and hand over the written warranty.

More detail on our full process and what the warranty covers.

Remodeling older Randleman bathrooms

Subfloor repair

Assessed once the old floor is up.

Layout first

In small rooms, layout matters more than tile.

Clear approvals

Extra work is approved in writing first.

Full Bathroom Remodel questions from Randleman homeowners

More answers on our FAQ page.

Other bathroom services in Randleman

Ready for your Randleman full bathroom remodel?

Use the form above or request your free Randleman quote on our contact page.