Fully remodeled bathroom with tiled shower and new vanity installed by BathPeak in a small-town frame house on a large lot near New London, Stanly County NC

New London, NC · Stanly County

Full Bathroom Remodeling in New London, NC

Rebuild an older New London bathroom with new supply lines, drains and ventilation.

Typical investment
$18,991 – $39,991
Timeline
Project-specific timeline
Warranty
1-year workmanship

Full Bathroom Remodel for New London homes

Inside New London, older houses more often need drain and venting work before finishes go in.

A full remodel replaces supply and waste lines where needed and adds a fan ducted outdoors.

BathPeak's general full-remodel range is $18,991–$39,991. You get one written package price with the full scope of work.

See everything we do in New London, or compare the full full bathroom remodel guide for our whole Stanly County, NC service area.

Free New London full bathroom remodel quote

Or call (336) 300-2524 and speak with our team now.

BathPeak serves New London as part of its Stanly County, North Carolina service area.

  1. Step 1: Project
  2. Step 2: Location
  3. Step 3: Timing
  4. Step 4: Investment
  5. Step 5: Contact

Step 1 of 5 · Project

What are you interested in?

Fully insured in NCRemodeling roots since 202230+ years combined install experience
Prefer to talk? Call (336) 300-2524
  • Fully insured in North Carolina
  • Permit requirements explained up front
  • Written package pricing · changes approved in writing
  • Project-specific timeline

Why New London homeowners choose BathPeak

  • Free in-home consultation
  • Written project scope
  • Written package pricing
  • Changes approved in writing
  • Project-specific timeline
  • Daily cleanup and communication
  • 1-year workmanship warranty
  • Insured
  • Experienced installation team
  • Serving New London
See how a BathPeak project works →

What a full bathroom remodel in New London includes

Electrical and ventilation

GFCI protection, dedicated vanity and light circuits where code requires, and an exhaust fan ducted to the exterior rather than the attic.

Waterproofing

A full bonded waterproof system on the shower walls and pan — not just cement board and hope — plus a flood test before any tile is set.

Tile and stone

Floor, shower walls, niches, curbs and accent bands set by tile-only installers, with sealed grout and properly sized movement joints.

Vanity, tops and fixtures

Cabinetry set level and anchored, quartz or cultured tops templated to fit, plus faucets, trim, mirrors and lighting installed and adjusted.

Glass, paint and punch list

Frameless or semi-frameless enclosure measured after tile, walls and trim painted, and a written punch list closed out before final payment.

Full demolition

Tile, tub, vanity, toilet, flooring and drywall removed to framing, with dust containment at the door and daily debris haul-off.

Full Bathroom Remodel pricing in New London

$18,991 – $39,991

Within BathPeak's general $18,991–$39,991 remodel range, hall and guest baths tend to land in the low-to-mid range, while primary suites with frameless glass, a double vanity and a separate shower and tub run toward the top.

Financing is available through Momnt Financing. Ask our team about current options during your consultation.

What moves the price

  • Subfloor, joist or supply-line repair found at demo
  • Tile selection — porcelain field tile versus stone or large-format
  • Frameless glass versus a semi-frameless or curtain opening
  • Double vanity, custom cabinetry or stone tops
  • Heated floors, niches, benches and linear drains

How your New London project runs

We aim to have key materials on hand before a New London remodel starts, so work can move steadily once demo begins.

  1. Step 1

    In-home consultation

    One visit covering design, materials and pricing. You get a written package quote with the full scope of work before we leave.

  2. Step 2

    Order and schedule

    Your deposit releases the material order, and we lock your install date — typically 10 to 21 days out.

  3. Step 3

    Demo and rough-in

    Tear-out, framing repair, plumbing and electrical rough-in.

  4. Step 4

    Waterproof and tile

    Bonded waterproofing, flood test, then floor and wall tile set and grouted.

  5. Step 5

    Finish and glass

    Vanity, tops, fixtures, paint, trim and the enclosure measured and installed.

  6. Step 6

    Walkthrough

    We walk the finished bathroom with you on the completion day, close the punch list and hand over the written warranty.

More detail on our full process and what the warranty covers.

Remodeling New London homes

Supply and waste

Replaced when needed.

Ventilation

Fan ducted outdoors.

Approvals

Hidden work approved in writing.

Full Bathroom Remodel questions from New London homeowners

More answers on our FAQ page.

Other bathroom services in New London

Ready for your New London full bathroom remodel?

Use the form above or request your free New London quote on our contact page.

Call Now