Tub-to-shower conversion with tiled walk-in shower installed by BathPeak in a college-town house near the walkable town center in Davidson, Mecklenburg County NC

Davidson, NC · Mecklenburg County

Tub-to-Shower Conversions in Davidson, NC

Convert the upstairs tub in your older Davidson home, with the floor framing checked first.

Typical investment
$8,991 – $14,991
Timeline
Project-specific timeline
Warranty
1-year workmanship

Tub-to-Shower Conversion for Davidson homes

Older Davidson homes often have their bathroom upstairs over original framing. A shower there needs a solid, well-waterproofed floor.

We check the framing once the tub is out and plan the base and waterproofing accordingly.

BathPeak's general conversion range is $8,991–$14,991. You get one written package price with the full scope of work.

See everything we do in Davidson, or compare the full tub-to-shower conversion guide for our whole Charlotte Metro, NC service area.

Free Davidson tub-to-shower conversion quote

Or call (336) 300-2524 and speak with our team now.

BathPeak serves Davidson as part of its Charlotte Metro, North Carolina service area.

  1. Step 1: Project
  2. Step 2: Location
  3. Step 3: Timing
  4. Step 4: Investment
  5. Step 5: Contact

Step 1 of 5 · Project

What are you interested in?

Fully insured in NCRemodeling roots since 202230+ years combined install experience
Prefer to talk? Call (336) 300-2524
  • Fully insured in North Carolina
  • Permit requirements explained up front
  • Written package pricing · changes approved in writing
  • Project-specific timeline

Why Davidson homeowners choose BathPeak

  • Free in-home consultation
  • Written project scope
  • Written package pricing
  • Changes approved in writing
  • Project-specific timeline
  • Daily cleanup and communication
  • 1-year workmanship warranty
  • Insured
  • Experienced installation team
  • Serving Davidson
See how a BathPeak project works →

What a tub-to-shower conversion in Davidson includes

Valve and fixtures

New pressure-balancing valve, showerhead and handheld, plus a recessed niche and optional bench.

Glass and finish

Semi-frameless or frameless glass templated after tile, silicone detailed, and the room left clean.

Tub removal and haul-off

Cast-iron or steel tub cut out and removed, surround stripped, and the alcove opened to bare framing.

Framing and subfloor check

Any rot at the old tub apron repaired, studs corrected, and blocking added for bars and glass.

Drain conversion

The 1.5-inch tub drain converted to a 2-inch shower drain, correctly trapped and vented to code.

Shower pan

A sloped, bonded pan built to the alcove — no pre-formed base fighting an out-of-square wall unless you prefer one.

Tub-to-Shower Conversion pricing in Davidson

$8,991 – $14,991

BathPeak tub-to-shower conversions commonly fall within a general range of $8,991 to $14,991 depending on scope, materials, layout changes, and site conditions. Tile choice and glass are the two biggest movers inside that range for a Davidson project.

Financing is available through Momnt Financing. Ask our team about current options during your consultation.

What moves the price

  • Drain resizing and re-venting in older homes
  • Subfloor repair at the old tub apron
  • Bench, niches and grab-bar blocking
  • Widening the alcove beyond the 60-inch standard
  • Valve upgrade to thermostatic with a handheld

How your Davidson project runs

We schedule Davidson conversions 10 to 21 days from your signed quote. Timelines depend on scope and site conditions; you get a project-specific schedule before work begins.

  1. Step 1

    In-home consultation

    We measure the alcove, check drain size and framing, price the conversion in writing and review tile options.

  2. Step 2

    Order and schedule

    Approval releases materials; your install date is locked, typically 10 to 21 days out.

  3. Step 3

    Tub out

    Demo, framing and subfloor repair, drain conversion, pan built.

  4. Step 4

    Waterproof and tile

    Membrane, flood test, then wall and floor tile.

  5. Step 5

    Trim out

    Grout, valve trim, niche and bar install, glass template, full cleanup.

  6. Step 6

    Walkthrough

    We run the shower with you, check drainage and slope, and hand over the written warranty.

More detail on our full process and what the warranty covers.

Converting an upstairs Davidson bath

Floor framing

Checked before the base goes in.

Waterproofing

Extra care over finished rooms below.

Finish choices

Tile or panels.

Tub-to-Shower Conversion questions from Davidson homeowners

More answers on our FAQ page.

Other bathroom services in Davidson

Ready for your Davidson tub-to-shower conversion?

Use the form above or request your free Davidson quote on our contact page.

Call Now