Tub-to-shower conversion with tiled walk-in shower installed by BathPeak in a 1920s-60s Albemarle home in the older core of Albemarle, Stanly County NC

Albemarle, NC · Stanly County

Tub-to-Shower Conversions in Albemarle, NC

Convert the tub alcove in your Albemarle brick ranch to a modern shower.

Typical investment
$8,991 – $14,991
Timeline
Project-specific timeline
Warranty
1-year workmanship

Tub-to-Shower Conversion for Albemarle homes

Albemarle has a wide band of post-war brick ranches beyond its older core off North Second and Pee Dee Avenue. Their hall baths usually have a standard tub alcove.

Converting that alcove to a shower in the same footprint is a practical upgrade.

BathPeak's general conversion range is $8,991–$14,991. You get one written package price with the full scope of work. BathPeak provides a project-specific schedule before work begins.

See everything we do in Albemarle, or compare the full tub-to-shower conversion guide for our whole Stanly County, NC service area.

Free Albemarle tub-to-shower conversion quote

Or call (336) 300-2524 and speak with our team now.

BathPeak serves Albemarle as part of its Stanly County, North Carolina service area.

  1. Step 1: Project
  2. Step 2: Location
  3. Step 3: Timing
  4. Step 4: Investment
  5. Step 5: Contact

Step 1 of 5 · Project

What are you interested in?

Fully insured in NCRemodeling roots since 202230+ years combined install experience
Prefer to talk? Call (336) 300-2524
  • Fully insured in North Carolina
  • Permit requirements explained up front
  • Written package pricing · changes approved in writing
  • Project-specific timeline

Why Albemarle homeowners choose BathPeak

  • Free in-home consultation
  • Written project scope
  • Written package pricing
  • Changes approved in writing
  • Project-specific timeline
  • Daily cleanup and communication
  • 1-year workmanship warranty
  • Insured
  • Experienced installation team
  • Serving Albemarle
See how a BathPeak project works →

What a tub-to-shower conversion in Albemarle includes

Glass and finish

Semi-frameless or frameless glass templated after tile, silicone detailed, and the room left clean.

Tub removal and haul-off

Cast-iron or steel tub cut out and removed, surround stripped, and the alcove opened to bare framing.

Framing and subfloor check

Any rot at the old tub apron repaired, studs corrected, and blocking added for bars and glass.

Drain conversion

The 1.5-inch tub drain converted to a 2-inch shower drain, correctly trapped and vented to code.

Shower pan

A sloped, bonded pan built to the alcove — no pre-formed base fighting an out-of-square wall unless you prefer one.

Waterproof membrane

Full bonded waterproofing over pan and walls, corners detailed by hand, flood tested before tile.

Tub-to-Shower Conversion pricing in Albemarle

$8,991 – $14,991

A conversion using solid-surface panels and a fixed glass panel sits near the bottom of that range; full tile with frameless glass sits near the top.

Financing is available through Momnt Financing. Ask our team about current options during your consultation.

What moves the price

  • Valve upgrade to thermostatic with a handheld
  • Tile versus solid-surface wall panels
  • Frameless glass, semi-frameless or a fixed panel
  • Drain resizing and re-venting in older homes
  • Subfloor repair at the old tub apron

How your Albemarle project runs

Because the footprint does not change, Stanly County conversions avoid the layout changes that stretch a full remodel.

  1. Step 1

    In-home consultation

    We measure the alcove, check drain size and framing, price the conversion in writing and review tile options.

  2. Step 2

    Order and schedule

    Approval releases materials; your install date is locked, typically 10 to 21 days out.

  3. Step 3

    Tub out

    Demo, framing and subfloor repair, drain conversion, pan built.

  4. Step 4

    Waterproof and tile

    Membrane, flood test, then wall and floor tile.

  5. Step 5

    Trim out

    Grout, valve trim, niche and bar install, glass template, full cleanup.

  6. Step 6

    Walkthrough

    We run the shower with you, check drainage and slope, and hand over the written warranty.

More detail on our full process and what the warranty covers.

Converting an Albemarle ranch bath

Same footprint

Usually no plumbing moves.

Finish options

Tile or panels.

Written schedule

Agreed before work starts.

Tub-to-Shower Conversion questions from Albemarle homeowners

More answers on our FAQ page.

Other bathroom services in Albemarle

Ready for your Albemarle tub-to-shower conversion?

Use the form above or request your free Albemarle quote on our contact page.

Call Now